IBM Multiprise 3000 S/390 Installation Manual page 30

Enterprise
Table of Contents

Advertisement

3 Power Signal Cables
1. Locate the Power Signal Cable frame
It will either be connected at LG16 of the CPC
or at the J04 positions on the OCAs of the I/O
01 frame.
Note: There are 4 connections at LG16
location. From left to right the first is
connected to the CPC frame. The
second connection is the one you will
use for this step.
2. Route the cable from frame to frame.
3. Connect the free end of the cable to the
positions indicated above.
1-16
Installing the System

Advertisement

Table of Contents
loading

Table of Contents