IBM Multiprise 3000 S/390 Installation Manual page 52

Enterprise
Table of Contents

Advertisement

3 Connecting the power cord
1. Connect the frame power cord(s) to OCA1
and OCA2.
2. After inserting the line cords slide line cord
retaining bracket to the left to secure the
line cords.
3. Connect the frame power cord(s) to
building power.
4. Repeat this step for each frame.
4-2
Installing the System
PWR OUT
PWR OUT
OCA FLT
OCA FLT
LOAD FLT
LOAD FLT
OT FLT
OT FLT
AMD FLT
AMD FLT
IBF FLT
IBF FLT
SVC
SVC
UEPO
UEPO
BYPASS
BYPASS
NORM
NORM
J4
J4
J3
J3
J2
J2
PWR IN
PWR IN
SVC
SVC
NORM
NORM
J1
J1

Advertisement

Table of Contents
loading

Table of Contents