IBM Multiprise 3000 S/390 Installation Manual page 22

Enterprise
Table of Contents

Advertisement

3 Casters
1. Locate 4 chocks, in the shipping box.
2. Slide the chock under all four casters.
Note: There are two types of chocks
available a rubber chock or wire
chock. Use whichever was
provided.
3. Repeat this step for each frame.
Locations
IBF 1
Blank
HDD
Carrier
IBF 2
1-8
Installing the System
Cryptographic Batteries
SSA Extenders
EPO
Switch
OCA Connectors
Diskette
Drive
CD ROM
OCA Connector
(Customer Power Cord)
4mm DAT
Tape Drive
MDA Connectors
OCA 2
OCA 1
J4
J3
J2
J1
J1
J2
External
Cable
Connection
Area
PL01/FIBB
PL01/FIBB
Connectors
J01
J00
J03
J02
JU0
MDA 2
MDA 1
MSA 2
MSA 1

Advertisement

Table of Contents
loading

Table of Contents