Mitsubishi MELSEC-Q Series User Manual page 334

C controller module
Hide thumbs Also See for MELSEC-Q Series:
Table of Contents

Advertisement

9
UTILITY OPERATION
(2) Test operation procedures
9
- 84
9.3 CC-Link utility
9.3.7 Operating Test screen
(a) Line test procedure
The line test can be executed only when the data link status (
of the CC-Link module is "In data link" or "During Auto-Returning".
1) Setting
Select the target station of the line test and click the
test.
2) Test result
• When the line test is executed after selection of "All stations (1-64)" in the
above step 1), the test result is displayed on the following screen.
Figure 9.68 Line test result when "All stations (1-64)" was selected
Refer to the following for error code details.
Section 18.4.1
• When the line test is executed after selection of "Selected station" in the
above step 1), the test result is displayed on the following screen.
Figure 9.69 Line test result when "Selected station" was selected
Refer to the following for error code details.
Section 18.4.1
Figure 9.67 Line test screen
Section 9.3.2)
button to start the line
OK

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q06ccpu-v-h01

Table of Contents