Mitsubishi MELSEC-Q Series User Manual page 163

C controller module
Hide thumbs Also See for MELSEC-Q Series:
Table of Contents

Advertisement

5
SETTINGS AND PROCEDURES BEFORE OPERATION
(4) When configuring a MELSECNET/H system
1)
Development environment (PC)
Figure 5.13 MELSECNET/H system configuration
Procedures for operation
Start up the C Controller module.
Set parameters, referring to (2) for a single CPU system,
or the flowchart in Section 17.1 for a multiple CPU system.
Start the MELSECNET/H utility, make connection target
setting, and connect the development environment
(personal computer) to the C Controller module.
On the Module information screen, verify the list of
MELSECNET/H modules controlled by the C Controller
module.
In the Parameter setting of the MELSECNET/H utility, set
the MELSECNET/H module parameters.
No
Is the access target system a
multiple CPU system?
Yes
Set the logical station No. on the <<Target setting>> tab
of the MELSECNET/H utility.
Is the system a single CPU system?
Yes
Write the set parameters from the <<Online operation>>
tab of the MELSECNET/H utility to the C Controller
*1
module.
Reset the C Controller module with the RESET/SELECT
switch. (Resetting the module makes the written
parameters effective.)
(To 2) on next page)
* 1 To write the parameters, connect the utility to the C Controller module with the write authority.
(
Section 5.11, Section 9.1.3)
Figure 5.14 Flowchart for MELSECNET/H system configuration
5.3 Settings and Procedures before Operation
C Controller module
MELSECNET/H
Ethernet
This section (1)
This section (2) or
This section (2) or
Section 17.1
Section 16.1
Section 9.1.3
Section 9.4.2
Section 9.4.6
Section 9.4.7
No
(To 3) on next page)
Section 9.4.5
Section 5.4 (3)
1
2
3
4
5
6
7
8
5
- 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q06ccpu-v-h01

Table of Contents