Start Up; Start Up Procedure - Mitsubishi F940GOT-SWD-E Operation Manual

Graphic operation terminals melsec-got
Hide thumbs Also See for F940GOT-SWD-E:
Table of Contents

Advertisement

Graphic Operation Terminal F940GOT
2.

Start up

This section describes the startup procedure from turning ON the power of the GOT to selec-
tion of the mode.
This section describes also the environment setting important to use of the GOT. Make sure to
read this section carefully.
2.1

Start up procedure

This paragraph describes the start up procedure from turning ON the power of the GOT to
selection of the mode.
Perform wiring of the power
supply unit of the GOT.
Connect the PLC.
Turn on the
power without
pressing the
touch key.
The OPENING SCREEN is
displayed.
When there is no screen data
• Perform wiring of the power supply unit of the GOT.
• Connect the GOT and the PLC with an optional connection
cable.
• Turn on the power of the GOT. When the power is turned on
Turn on the
while the upper left corner (which functions as a touch key)
power while
pressing the
of the screen of the GOT is pressed and held for 1 second
touch key.
or more, the SET-UP MODE screen is displayed.
• The OPENING SCREEN screen indicating the model
name, the version, etc. is displayed for the period set in
"OPENING SCREEN" on the SET-UP MODE screen.
• On the SET-UP MODE screen, set the used mode, the con-
The SET-UP
nected PLC name, etc. The operation environment can be
MODE screen
is displayed.
set on the OTHER MODE screen also.
• Connect the GOT and the PLC with an optional connection
A user screen
cable.
is displayed.
Start up 2
2-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F940got-lwd-e

Table of Contents