Douwe Egberts Cafitesse 100 Service Manual page 32

Table of Contents

Advertisement

Service Manual Cafitesse 100
Putting the dispenser into operation on ferries
Dismount the overflow hose (1) provided by
the manufacturer. (Fig. 1)
Cut 365 mm (14.37 in) off from the hose
(piece goods).
Directly connect the boiler overflow
chamber (4) and the outlet of the overflow
tray (3) to the new hose (2). (Fig. 1)
Connect the outlet hose.
A table fixing is not provided by the
manufacturer. However, it is urgently
recommended depending on the local
conditions.
WARNING:
The dispenser only operates
up to the following maximum
tilts:
Tilt to the left and front:
each 12°, i.e. 130 mm (5.12 in)
Tilt to the right and to the rear
each 10°, i.e. 110 mm (4.33 in)
WARNING:
There is the danger of being
scalded by hot water. Keep
hands and other parts of the
body away from the delivery
area.
If the tilts exceed these values
- the water supply must be closed
- the dispenser must be switched off with
the main switch
- the boiler must be drained via the hot
water delivery tap
(place a sufficiently large container
underneath the hot water delivery tap)
If the tilt decreased again below the above
mentioned values:
- open the water supply
- switch the dispenser on.
2 - 18
Installation / Putting into Operation
4
2
3
Fig. 1
1
07.2004

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents