Installation

5.1

General

The mechanical and electrical installation of the EM-ABS-01 extension module must be
carried out by qualified personnel according to the general and regional safety and
installation directives. For a safe operation of the frequency inverter it is necessary
that the documentation and the device specifications be complied with during installa-
tion and commissioning. In the case of special applications, you may also have to
comply with further guidelines and instructions.
The frequency inverters are designed according to the requirements and limit values
of product norm EN 61800-3 with an interference immunity factor (EMI) for operation
in industrial applications. The electromagnetic interference is to be avoided by expert
installation and observation of the specific product information.
For further information, refer to the chapter "Electrical Installation" of the frequency
inverter operating instructions.
Warning!
5.2

Mechanical Installation

Danger!
Before assembly or disassembly of the EM-ABS-01 extension module, the frequen-
cy inverter must be de-energized. Take appropriate measures to make sure it is
not energized unintentionally.
Make sure that the frequency inverter is discharged.
Danger!
03/12
All connection terminals where dangerous voltage levels may be present
(e.g. motor connection terminals, mains terminals, fuse connection ter-
minals, etc.), must be protected against direct contact.
If the following instructions are not complied with, there is direct danger
with the possible consequences of death or severe injury by electrical
current. Further, failure to comply can lead to destruction of the frequency
inverter and/or of the extension module.
When the frequency inverter is disconnected from power supply, the
mains, DC-link voltage and motor terminals may still be live for some
time. Wait for at least three minutes until the DC link capacitors have
discharged before starting to work at the unit.
EM-ABS-01 for ACU