Chapter 2: Installing the PRO2
Before installing your Smart PRO2 unit, look over the following lists to make sure you have all the items shipped
with the unit, as well as any other items needed for proper installation.
Standard Accessories
Mounting Hardware
•
Vertical Models: Two mounting buttons with two M4 (10 mm) screws.
Horizontal Models: Two removable L-brackets with four M4 screws (for 1U models),
•
or M5 screws (for 2U models).
Cables/Adapters
•
For C2L, C2LG, C2X, C2XG, or SEV models – link cables (6P6C connectors).
Link units are shipped with a 7-inch link cable and a 14-foot link cable.
•
Additional Items
Units with IEC C20 power inlets: input power cords (ordered separately).
•
Optional Accessories
Star-Link Module Kit (Part No. KIT-PRO2LINK-01M).
•
Temperature/Humidity Sensors (Part No. EMTH-1-1).
•
Environmental Monitor (Part No. EMCU-1-1B).
•
Water Sensor (Part No. EMWS-1-1, used with EMCU-1-1B).
•
•
Vertical mounting brackets; additional mounting options are available in the Accessories section of
www.servertech.com.
Additional Required Items
•
Flathead and Phillip screwdrivers.
Screws, washers, and nuts to attach the PRO2 unit to your equipment rack.
•
Installing the PRO2
Smart PRO2 – User Guide
•
12
Need help?
Do you have a question about the PRO2 Switched POPS C2WG12BM and is the answer not in the manual?