6 Perform an Analysis
S
T
I
AMPLE
UBE
NSTALLATION
Repeat these steps for each sample tube to be installed.
If using...
A rubber stopper
An isothermal jacket
A filler rod
1. Remove the sample tube stopper.
If using a filler rod, hold the sample tube horizontally and carefully side the filler rod into
n
the tube.
If using an isothermal jacket, slide the jacket down over the stem of the sample tube
n
until it touches the sample tube bulb.
2. Insert the P
tube into the center hole of the Dewar cover and slide the cover up. Ensure the
0
tapered side of the cover is facing downward.
3. Insert the sample tube through one of the holes in the cover.
6 - 8
Then...
Remove it.
Slide the jacket down over the stem of the sample tube until it touches
the sample tube bulb.
Hold the sample tube horizontally and carefully slide the filler rod into
the tube.
Do not hold the rod vertically and drop the rod into the
tube; this could break the rod and/or tube.
TriStar II Plus Operator Manual
303-42800-01 (Rev M ) — Sep 2023
Need help?
Do you have a question about the TRISTAR II PLUS and is the answer not in the manual?
Questions and answers