Kaco blueplanet 92.0 TL3 US Manual page 59

Grid support interactive inverter
Table of Contents

Advertisement

Manual
Country-
Level Display/
spec. Set-
settings
tings
Connection Conditions
2
4
1
3
4
Min. conn. voltage af-
1
2
3
4
4
ter grid mon.
10 – 110 [% Unom] /
0.1 &
Max. conn. voltage af-
ter grid mon.
90 – 125 [% Unom] /
0.1
Min. conn. frequency
1
2
3
4
4
after grid mon.
45 – 65 [Hz] /
&
Max. conn. frequency
after grid mon.
45 – 65 [Hz] /
Min. conn. voltage af-
1
2
3
4
4
ter grid failure
10 – 110 [% Unom] /
0.1 &
Max conn. voltage af-
ter grid failure
90 – 125 [% Unom] /
0.1
Min. conn. frequency
1
2
3
4
4
after grid failure
45 – 65 [Hz] /
&
Max. conn. frequency
after grid failure
45 – 65 [Hz] /
Monitoring time grid
1
2
3
4
4
voltage
1000 - 1800000
[ms] /
1000 &
Monitoring time PV
voltage
1000 - 1800000
[ms] /
1000
Waiting time after grid
1
2
3
4
4
failure
1000 - 1800000
[ms] /
1000
Password protection
Status
KACO blueplanet 92.0 TL3 US KACO blueplanet 110 TL3 US KACO blueplanet 125 TL3 US
Action in this menu/meaning
NOTE: According to their network conditions, exact connec-
tion conditions must be set.
F Specify switch-on voltage range after grid error.
F Specify switch-on frequency range after grid error.
0.01
0.01
F Specify switch-on voltage range after grid error.
F Specify switch-on frequency range after grid error.
0.01
0.01
F Zeit für die Beobachtung der Netzspannung und PV-Spannung
definieren.
60000 /
60000 /
1. Set waiting time after grid error.
2. Activate optional password protection.
3. Confirm the action field.
60000 /
Configuration and operation | 9
Page 59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blueplanet 110 tl3 usBlueplanet 125 tl3 us

Table of Contents