11. If removed, install the air baffle.
12. Install the access panel.
13. Do one of the following:
Orient the server back in tower mode.
Install the server into the rack.
14. Connect all peripheral cables to the server.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17. Power up the server.
HPE ProLiant ML30 Gen10 Plus Server Maintenance and Service Guide
121