Installing The Dryers (Figures 3-4A And B) - Ametek 5800 User Manual

Moisture
Table of Contents

Advertisement

Dryer Compartment
Figure 3-4a.
Dryer locations for
installation.
3-8 | 5830 Moisture Analyzer

Installing the Dryers (Figures 3-4a and b)

Prior to operating the 5830 analyzer, the dryers must be installed. Two
dryers have been supplied with this analyzer. Make sure that you have
the two new dryers, the four new VCR gaskets available before beginning
installation.
The amount of time that the dryer fittings are left open should be kept
!
to less than a minute to avoid damage to the device.
CAUTION
1.
On the right side of the rear of the analyzer is the dryer acess com-
partment (Figure 3-4).
2.
Loosen the four captured screws on the door of the compartment to
remove the door.
4.
You will install the one dryer in the top position (Sample System
Dryer), and the other in the bottom position (Zero Dryer).
5.
Remove the dryer mounting screws that hold the dryers in place and
set them aside.
Cover
Sample System Dryer
(top dryer)
Zero Dryer
(bottom dryer)
Dryer Mounting Screws
(2 each)
1/8" VCR Gasket
(2 ea dryer)

Advertisement

Table of Contents
loading

This manual is also suitable for:

583058122850

Table of Contents