Sun Microsystems SPARCcenter 2000 Service Manual page 316

Hide thumbs Also See for SPARCcenter 2000:
Table of Contents

Advertisement

Index-2
C
cable
12 VDC, 8-6, 8-36
24 VDC power supply, 8-6
address
SCSI, 12-15
backplane filter, 8-36
blower power, 8-6
power sense, 8-6
SCSI
targeting, F-1
tray
data, 8-36, 8-40, 12-17
DC, 8-36, 8-39
voltage sense, 8-36
worksheet, 6-4
card retainer, SBus, 11-8
color frame buffer, CG6, E-13
configure
JumpStart, 2-3
link integrity test, 11-9
connection, SCSI probe test, 3-15
connector pinout, D-1
keyboard/mouse, D-2
serial port, D-3
XDBus backplane, D-8 to D-12
control board, B-8
remove, 8-32
D
data cable assembly, SCSI, 12-17
DC cable assembly, SCSI, 12-16
diagrams, block, B-1
differential SCSI disk tray, 8-48
addresses, 9-36
assembly, 12-14
drive, remove, 9-26
power supply remove, 8-56
disable Link Integrity Test, 11-9, C-1
disk drive
5 1/4-inch, 9-26, F-10
caution, 6-6
SPARCcenter 2000/2000E Service Manual—June 1996
tray
assembly, 12-14
cabling, E-12
safety, 7-9
distribution unit See AC distribution unit
document organization, xxiii
drive
probe, 3-15
test manually, 6-7
DSBE/S
cabling rules, E-12
card, 11-9, C-2
prepare, 11-8
E
electrical specification, A-2
EMI shield See panel, remove, EMI
enable Link Integrity Test, 11-9, C-1
environmental requirements, A-4
ethernet
interface rules, E-12
problem, 4-12
jammed, 4-10
no carrier, 4-10
expansion cabinet, interface, E-12
external
cables, 6-3
options, 1-3
F
file, boot, 4-10
filler panel, SBus card, 11-10
filter cable, backplane, 8-36
flow diagrams
categories, 4-1
network, 4-10 to 4-12
overview, 4-2
physical inspection, 4-3 to 4-4
power-on self-test (POST), 4-5 to 4-7
SBus card, 4-7
SIMM, 4-6
SuperSPARC modules, 4-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparccenter 2000e

Table of Contents