Siemens SC 7000 Service Manual page 64

Patient monitors
Table of Contents

Advertisement

Service Manual
6 Replacing
Subassemblies in
Rear Housing
6.1 Removing/Installing
Funnel
5HPRYLQJ )XQQHO
,QVWDOOLQJ )XQQHO
6.2 Main Processor PCB
Subassembly
48
Figure 3-8 Top Release Tabs for Front Bezel Subassembly
4) Return monitor to its proper upright position, with back of monitor
facing you.
5) Insert tip of small screwdriver into each of two release slots on top of
monitor (see Figure 3-8), as you apply a slight tension between front
bezel subassembly and rear housing, to slightly separate top of front
bezel subassembly from rear housing.
Note: It is helpful to lift the handle as shown in Figure 3-8 to access
the release slots.
6) Turn monitor around so that display screen is facing you.
7) Carefully pull Front Bezel Subassembly straight out from rear housing
to unplug interfacing connector on back right-hand side of Front Bezel
PCB from corresponding connector on Main Processing Board, and
separate the two subassemblies.
The only replaceable components contained in the rear housing, that
require the monitor to be opened, are the Main Processor PCB
Subassembly, the Funnel, and the Rear Housing Subassembly. Other
replaceable components and subassemblies, that do not require that the
monitor be opened, are discussed in
Tabs on the top edge of the funnel located on the top of the heat sink on the
Main Processor PCB Subassembly lock the funnel into the rear housing.
1) After opening monitor, set rear housing subassembly bottomside down
so that Main Processor PCB Subassembly is facing you.
2) Using small common-blade screwdriver, depress locking tabs near left
and right sides of funnel through slots on top edge of rear housing (
in
Figure 3-9 on page
housing.
Reverse steps 1 and 2 to install funnel.
The Main Processor PCB Subassembly is secured in the rear housing as
follows:
• Tabs on the top edge of the funnel (
into slots in the top of the rear housing (
bottom edge of the funnel restrains the top edge of the heat sink and
holds the subassembly securely in the housing.
Siemens Medical Systems, EM-PCS, Danvers
NOT A CONTROLLED DOCUMENT
SC 7000 and SC 9000XL Patient Monitors
Section 4
above.
50) to release funnel, and slide funnel out of rear
(
0
in
Figure 3-9 on page
in
Figure
7k9kXLSM.c3.CD_ROM.fm/04-99/kaupp
0
50) lock
3-9). The back
ASK-T898-03-7600

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc 9000xl

Table of Contents