Cylinder Disassembly - Boom Extension External Cylinder Gth-4013Ex - Terex Genie GTH-4017 EX Service Manual

Table of Contents

Advertisement

November 2008
Cylinder disassembly
Procedure:
Boom extension external cylinder
GTH-4013EX
Bridge crane, payload 500 kg
Textile bridles or chains with hooks
Operation:
1 Set the boom to horizontal position with the
telescope slightly extended to work on the
cylinder connecting pin (rod side).
2 Remove the screw fixing the pin to the boom
section using two 17mm wrench.
3 Extract out and knock the pin using a plug of
soft material (aluminium, copper, wood, etc.).
4 Remove the two screws of the bracket A using
a 22mm wrench.
5 Place a container of suitable size under the
hydraulic piping before disconnecting.
PROTECT THE
ENVIRONMENT
Used oils must be handled and disposed of
according to local regulations. Address to
legally authorised centres.
6 Using a 24 mm wrench, disconnect the two
hydraulic hoses (B) and the two hoses (C) , then
plug the disconnected connectors to prevent
dust and impurities from entering the circuit.
Document 57.0009.0427
GTH-4017EX GTH-4514EX GTH-4013 EX
007
Table:
GTH-4017EX
GTH-4514EX
GTH-4013EX
Standard tools
A
C
Section 7 - Repair Procedures
TABLE
92
Hours Min.
2
2
B
007
30
1
4
6
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Genie gth-4514 exGenie gth-4013 ex192961928619266

Table of Contents