November 2008
7.1
TIME SCHEDULE
Job
change the ignition key
change the speed selector
change the lights and horn selector
change the overload warning system display
re-calibrate the overload system
change the load cell
change the overload warning system display and calibrate
change joystick
change joystick push button
change brake pump
change the low boom micro-switch
change the high boom micro-switch
change the boom lifting cylinder
change the boom lifting cylinder kit
(complete overhaul)
change the block valve of the boom lifting cylinder
change the cylinder inside the boom (GTH-4013EX)
change the cylinder inside the boom kit (GTH-4013EX)
change the block valve of the extension cylinder
inside the boom (GTH-4013EX)
change the extension cylinder on the boom
change the extension cylinder on the boom kit
change the valve of the extension cylinder on the boom
change the re-sequencing valve of the
extension cylinder inside the boom (GTH-4013EX)
change the re-sequencing valve of the
extension cylinder on the boom (GTH-4013EX)
change the fork pitching cylinder
change the fork pitching cylinder kit
change the valve of the fork pitching cylinder
change locking fork cylinder
change locking fork cylinder kit
change block valve of the attachment locking cylinder
change the outrigger up/down movement cylinder
change the outrigger up/down movement cylinder kit
Document 57.0009.0427
GTH-4017EX GTH-4514EX GTH-4013 EX
Section 7 - Repair Procedures
Repair Procedures
Operators
needed
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
Expected
time (h)
1,00
0,30
0,30
0,15
1,00
2,00
1,00
1,30
1,00
2,00
0,30
0,30
3,00 cad.
2.00
0,30
2,50 cad.
1,30
1,30
1,00 cad.
1,30
0,30
2,30
2,30
1,30
1,30
0,30
1,00
1,30
0,30
1,30
1,30
1