To Install A Capillary Column With The Purged Packed Inlet - Agilent Technologies Agilent 7890 Series Maintenance Manual

Gas chromatograph
Table of Contents

Advertisement

6
Maintaining the Purged Packed Inlet

To Install a Capillary Column with the Purged Packed Inlet

WA R N I N G
WA R N I N G
C A U T I O N
72
1
Gather the following:
Column
Ferrule (See
"Consumables and Parts for the Purged
Packed Inlet"
on page 68.)
Column nut
Glass liner
Viton O- ring
0.53- mm column adapter
Septum
1/4- inch wrench
Metric ruler
Lint- free gloves
Load the
inlet maintenance method
2
to become ready.
Be careful! The oven and/or inlet may be hot enough to cause
burns. If the inlet is hot, wear heat-resistant gloves to protect your
hands.
Wear safety glasses to protect your eyes from flying particles
while handling, cutting, or installing glass or fused silica capillary
columns. Use care in handling these columns to prevent puncture
wounds.
3
Install a 0.53- mm column adapter. (See
Adapter on the Purged Packed Inlet"
Wear clean, lint-free gloves to prevent contamination of parts with
dirt and skin oils.
Install a new Viton O- ring. (See
4
on the Purged Packed Inlet"
5
Place a septum, capillary column nut, and ferrule on the
column.
and wait for the GC
"To Install an
on page 81.)
"To Change the O- Ring
on page 83.)
Maintaining Your GC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents