Agilent Technologies Agilent 7890 Series Maintenance Manual page 88

Gas chromatograph
Table of Contents

Advertisement

6
Maintaining the Purged Packed Inlet
88
Blow the inside of the inlet dry with compressed air or
11
nitrogen.
12
Install the adapter, if used. (See
the Purged Packed Inlet"
Install the glass liner and O- ring. (See
13
Glass Liner on the Purged Packed Inlet"
14
Install the top insert weldment and finger- tighten.
15
Install the septum and septum nut. (See
Septum on the Purged Packed Inlet"
Attach the column. (See
16
with the Purged Packed Inlet"
17
Check for leaks.
18
Restore the analytical method.
19
Set the septum and glass liner counters.
"To Install an Adapter on
on page 81.)
"To Change the
on page 84.)
"To Change the
on page 77.)
"To Install a Capillary Column
on page 72.)
Maintaining Your GC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents