Agilent Technologies Agilent 7890 Series Maintenance Manual page 51

Gas chromatograph
Table of Contents

Advertisement

WA R N I N G
Maintaining Your GC
After the column is installed at both inlet and detector,
16
establish a flow of carrier gas and purge as recommended
by the column manufacturer.
Restore the analytical method.
17
For FID or FPD, immediately turn off the flame.
For NPD, immediately turn off the bead.
After the GC becomes ready, wait 10 minutes then ignite
18
the detector flame or bead.
Be careful! The oven, inlet, and/or detector may be hot enough to
cause burns. If they are hot, wear heat-resistant gloves to protect
your hands.
Allow the oven, inlet, and detector to equilibrate at
19
operating temperature, then retighten the fittings.
20
Reset the EMF counter. See
the Operation Manual.
Maintaining the Split/Splitless Inlet
To Reset an EMF Counter
5
in
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents