Back End Processor Boot Up - GE LOGIQ P9 Service Manual

Hide thumbs Also See for LOGIQ P9:
Table of Contents

Advertisement

GERAFT
D
5604324, R
IRECTION
EVISION
3-7-2-2

Back End Processor Boot Up

When AC power is applied to the scanner, the ON/OFF button on the control panel illuminates blue,
NOTICE
indicating that the System (including the Back-end Processor) is in Standby mode.
!! NOTICE:
8) Hold down the On/Off button (see:
NOTE:
The mains outlet of the system for peripheral auxiliary equipment are commonly switched with the
ON/OFF button. The power switch of any attached printer(s) needs to be in ON position before starting
the system. However, be aware some auxiliary equipment may switch itself to standby mode
(e.g., Color video printer) and must therefore be switched on separately.
When the ON/OFF button on the control panel is pressed, the System (including the Back-end
Processor) starts and the operating system is loaded which then leads the application software to
activate the scanner.
The system automatically performs an initialization sequence which includes the following:
-
-
-
On/Off Button
As soon as the software has been loaded, the system enters 2D-Mode with the probe connected to port
nearest to a user.
NOTE:
Total time used for start-up is about 2 minutes.
9) Adjust Height and position of control console.
3-22
11
DRAFT (J
Loading the operating system.
Running a quick diagnostic check of the system.
Detecting connected probes
Figure 3-10 On/Off Button on Control Panel
Section 3-7 - Completing the Set Up
24, 2019)
ANUARY
Figure
3-10) on the control panel for ~3 seconds.
LOGIQ P9/P7
S
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq p7

Table of Contents