Back End Processor Boot Up - GE Voluson P6 Service Manual

Hide thumbs Also See for Voluson P6:
Table of Contents

Advertisement

GE H
DRAFT
EALTHCARE
DIRECTION 5459672-100, R
3-6-2-2

Back End Processor Boot Up

When AC power is applied to the scanner, the ON/OFF button on the control panel illuminates amber,
NOTICE
indicating that the System (including the Back-end Processor) is in Standby mode.
!! NOTICE:
4.) Hold down the On/Off button (see:
NOTE:
The mains outlet of the system for peripheral auxiliary equipment are commonly switched with the
ON/OFF button. The power switch of any attached printer(s) needs to be in ON position before starting
the system. However, be aware some auxiliary equipment may switch itself to standby mode
(e.g., Color video printer) and must therefore be switched on separately.
When the ON/OFF button on the control panel is pressed, the System (including the Back-end
Processor) starts and the operating system is loaded which then leads the application software to
activate the scanner.
The system automatically performs an initialization sequence which includes the following:
-
-
-
As soon as the software has been loaded, the system enters 2D-Mode with the probe and application
that were used before the system was shut down.
NOTE:
Total time used for start-up is about 2 minutes.
6
DRAFT (J
EVISION
Loading the operating system.
Running a quick diagnostic check of the system.
Detecting connected probes
Figure 3-14 On/Off Button on Control Panel
Chapter 3 - Setup Instructions
17, 2013)
ANUARY
Figure
3-14) on the control panel for ~3 seconds.
V
® P8 / V
OLUSON
OLUSON
P
S
M
ROPRIETARY
ERVICE
On/Off Button
® P6
ANUAL
3-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Voluson p8

Table of Contents