LEGRAND Server Technology PRO1 User Manual page 66

Sentry switched dc pdu
Table of Contents

Advertisement

Control > Groups
The Control Groups page displays outlet groups assigned to a current user and allows power control actions (On,
Off, Reboot) to be applied to all outlets in a selected outlet group.
Note: An outlet group is a named collection of outlets in a PDU (up to four enclosures) with a single
IP address.
To issue outlet control on a specific outlet group:
1. From the group drop-down menu, select the outlet group by name.
2. From the control action drop-down menu, select the outlet command On, Off, or Reboot.
3. Click Apply. The command is issued immediately on all outlets in the selected outlet group.
PRO1 Sentry Switched DC PDU
66 of 211

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Server Technology PRO1 and is the answer not in the manual?

Table of Contents