Chapter 3: Installing The Sentry Switched Dc Pdu; Standard Accessories; Optional Accessories; Additional Required Items - LEGRAND Server Technology PRO1 User Manual

Sentry switched dc pdu
Table of Contents

Advertisement

Chapter 3: Installing the Sentry Switched DC PDU

Before installing your Sentry DC PDU, look over the following lists to make sure you have all the items
shipped with the unit, as well as any other items needed for proper installation.

Standard Accessories

Mounting Hardware:
Two removable flanges with M4 screws.
Cables/Adapters:
RJ45 to RJ45 crossover cable.
RJ45 to DB9F serial port adapter (for connection to standard DB9M DTE serial port).

Optional Accessories

The Star-Link Dongle Kit (Part
Temperature/Humidity Sensors

Additional Required Items

Flathead and Phillip screwdrivers.
Screws, washers, and nuts to attach the PDU to your equipment rack.
No. KIT-PRO2LINK-01D).
(Part No. EMTH-1-10 [10-ft] and EMTH-1-20 [20-ft]).
Sentry Switched DC PDU
33 of 211

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Server Technology PRO1 and is the answer not in the manual?

Table of Contents