Waters Xevo TQD Operator's, Overview And Maintenance Manual page 213

Hide thumbs Also See for Xevo TQD:
Table of Contents

Advertisement

3.
Attach the NW25 tee to the inlet of the pump using the NW25 center
ring, and then secure the connection with a clamp.
1-inch ID
vacuum hose
Clamps
Flange
NW25 tee
Pump inlet
4.
Using the NW25 center rings and clamp, and the 7-mm nut driver,
attach the flanged end of a length of 1-inch ID vacuum hose to the top
port on the NW25 tee, and the 10-mm reducer fitting and a length of
10-mm ID nylon tubing to the middle (perpendicular) port on the tee.
5.
Using 2 hose clamps, connect the opposite end of the length of 1-inch
vacuum hose in
instrument's rear panel.
6.
Connect the opposite end of the 10-mm nylon tube to the 10-mm source
vent port on the instrument's rear panel.
Caution:
exhaust tubing squarely (that is, perpendicular to its horizontal
axis).
7.
Using 1 hose clamp, connect a length of 12.7-mm clear PVC exhaust
tubing to the roughing pump exhaust port NW25 nozzle fitting.
step 4
to the 1-inch OD straight vacuum port on the
To avoid gas leaks, use the sharp knife to cut the PVC
Connecting the oil-filled roughing pump
10-mm nylon tube
10-mm reducer
fitting
TP03414
B-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents