Waters Xevo TQD Operator's, Overview And Maintenance Manual page 217

Hide thumbs Also See for Xevo TQD:
Table of Contents

Advertisement

NW40 clamps (included in the installation kit)
NW25/NW40 adaptor (included in the installation kit)
10-mm reducer fitting (included in the installation kit)
10-mm ID nylon tube (included in installation kit)
12.7-mm clear PVC exhaust tubing (included in the Waters Rotary
Pump Kit)
PVC hose clamps (included in the Waters Rotary Pump Kit)
1-inch ID vacuum hose (included in the Waters Rotary Pump Kit)
To connect the oil-free roughing pump
Warning:
contaminated with biohazardous and/or toxic materials.
Always wear chemical-resistant, powder-free gloves when
performing this procedure.
Caution:
• To ensure correct operation of the roughing pump, install it
within 1 degree of horizontal.
• Locate the roughing pump in an area where the ambient
temperature is 12 to 40 ºC (54 to 104 ºF).
• To ensure proper ventilation, install the pump with the
following minimum clearances:
Back-side minimum clearance
is 15.24 cm (6 inches)
Left-side minimum clearance
is 15.24 cm (6 inches)
The pump and its connections can be
Connecting the Edwards oil-free roughing pump
Right-side minimum clearance
is 15.24 cm (6 inches)
TP03165
Front-side minimum clearance
is 35.56 cm (14 inches)
B-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents