Fitting The Ion Block Assembly To The Source Assembly - Waters Xevo TQ-S Operator's, Overview And Maintenance Manual

Ivd mass spectrometry system
Table of Contents

Advertisement

Fitting the ion block assembly to the source assembly

Required materials
Chemical-resistant, powder-free gloves
Combined 2.5-mm Allen wrench and cone extraction tool
To fit the ion block assembly to the source assembly
Warning:
biohazardous and/or toxic materials. Always wear
chemical-resistant, powder-free gloves while performing this
procedure.
Warning:
the source enclosure open if an ESI probe is fitted.
Caution:
chemical-resistant, powder-free gloves during this procedure.
1.
Fit the ion block assembly to the PEEK ion block support.
2.
Use the combined 2.5-mm Allen wrench and cone extraction tool to fit
and then slowly tighten the 4 ion block assembly securing screws
sequentially and in small increments.
3.
Open the source isolation valve (see
4.
Fit the source enclosure (see
5.
Close the source enclosure.
6.
Connect the power cords for the mass spectrometer and both roughing
pumps to the main power source.
The source components can be contaminated with
To avoid puncture wounds, take great care while working with
To avoid recontaminating the ion block assembly, wear clean
page
4-10).
page
4-9).
Cleaning the ion block assembly
:
4-51

Advertisement

Table of Contents
loading

Table of Contents