14.1
Maintenance
Nurse call system specialists must perform annual maintenance of the nurse call sys-
tem. This comprises:
Care and cleaning of system parts, cleaning of ventilation openings.
The batteries of the power supply unit UPS (77 3400 00) and the battery set for
UPS 60 (77 3450 00) should be replaced every 2 years.
The batteries in uninterruptible power supply provided with system computers
must be replaced according to the documentation provided by the manufacturer.
Installation of necessary system updates.
Readjustment and calibration of parts and devices.
WARNING! In all cases in which the nurse call system is switched off entirely or
partially, the system owner must guarantee another form of monitoring of the
affected rooms in the meantime.
After maintenance, the nurse call system must be inspected and any remaining faults
must be eliminated.
The work to be performed must be documented in an operating logbook available on
the system.
14.2
Inspection
Nurse call system specialists must regularly inspect the nurse call system every 3
months, i.e., check for proper function and repair when necessary.
Inspection every 3 months:
Call switches and mobile devices for triggering calls provided for use by patients
Signal lamps and acoustic signal generators
The power supply
Inspection every 12 months:
All other devices for call triggering, call cancelling and presence registration
All other display equipment
All devices for call answering
All connected devices for recording, forwarding and displaying calls, e.g., con-
nection sockets for the connection of call-triggering devices.
The work to be performed must be documented in an operating logbook available on
the system.
IP
Flamenco
- Technical Manual - 00 8813 52, 03/18 (Rev. 1.0)
14. Servicing
73