Installation Work Sequence - Tunstall FlamencoIP Technical Manual

Hide thumbs Also See for FlamencoIP:
Table of Contents

Advertisement

6. Installation work sequence

As a rule, you install the nurse call system on a ward-by-ward basis. This means that
you first install a ward, put it into operation and then install the next one. The steps
are always the same.
Work step
Defining the mounting positions.
1.
Installation of back boxes.
2.
Laying the cables.
3.
Mounting and connecting devices (incl. fac-
4.
tory-configured IP-SystemManager, operat-
ing mode "Local").
Commissioning installed, configured IP net-
5.
work.
Mounting and connecting factory-config-
6.
ured IP-SystemManager, operating mode
"System" or "System + Local".
Switching on and checking of power supply.
7.
Configuring the room terminals (ComTermi-
nal Flamenco, RoomTerminal Flamenco,
ControlTerminal Flamenco, ControlTerminal
with doorplate Flamenco).
8.
Commissioning the ward console (ComSta-
BUS-C
9.
tion
, ComStation
Flamenco) or ComStation
Connecting and commissioning the Man-
agementCenter.
10.
Functional check of the system.
12.
IP
Flamenco
- Technical Manual - 00 8813 52, 03/18 (Rev. 1.0)
PC
CT
, ComStation
T
Flamenco
Description
You will find information about this in the Flamen-
IP
co
Planning Manual, chapter "Mounting posi-
tions". You can download the planning manual
from the following website:
http://www.tunstall.de/artikelnummer/00881341
refer to chapter 7. "Installation of back
boxes" on page 37.
refer to chapter 8. "Laying the cables" on
page 41.
refer to chapter 16. "Product leaflets" on
page 113.
refer to chapter 5. "IP network" on
page 25.
refer to chapter 16. "Product leaflets" on
page 113.
refer to chapter 9. "Activating the power
supply" on page 51.
For ComTerminal Flamenco, RoomTer-
minal Flamenco: refer to chapter 16.
"Product leaflets" on page 113.
ControlTerminal Flamenco, ControlTer-
minal with doorplate Flamenco: refer to
online help delivered with the ControlTer-
minal ConfigSet (order no. 77 0920 00).
refer to the documents delivered with the
ward console.
refer to the ManagementCenter online
and the product leaflet for the Manage-
mentCenter, refer to chapter 16. "Prod-
uct leaflets" on page 113.
refer to chapter 10. "Functional checks"
on page 53.
35

Advertisement

Table of Contents
loading

Table of Contents