Month Maintenance Actions - Barco HDF W Series Service Manual

Hide thumbs Also See for HDF W Series:
Table of Contents

Advertisement

3.2

3 month maintenance actions

Perform every three months
The 3 month maintenance actions, listed below, may be performed by a trained projectionist who is familiar
with potential hazards associated with the product.
No.
Maintenance action
1
Clean the air vents/inlets of the projector (front and rear side of the projector).
2
Clean the cabinet of the projector.
R5905312 HDF W SERIES 24/01/2013
3. Preventative maintenance actions
Remarks
Use a vacuum cleaner.
Removal overall dust accumulation on
projector covers.
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents