Toshiba e-STUDIO555 Service Manual page 290

Multifunctional digital systems
Hide thumbs Also See for e-STUDIO555:
Table of Contents

Advertisement

[A] Heater control PC board (IH board)
(1)
Open the front cover. Then pull out the
transfer/transport unit by turning its handle
clockwise.
(2)
Remove 2 screws and open the IH cover-1
carefully to the front side.
(3)
Remove 4 screws and then release 4 power
supply harnesses of the IH coil.
Notes:
1. Be sure that each of these harnesses is
connected to the proper position.
2. Use tightening torques of 1.2-2.0 N•m for
the 4 screws connecting these power
supply harnesses.
3. Since the IH board is a high-voltage
section, be sure to pull out the power
cable before starting maintenance or
checking. Especially do not touch the
IGBT when the power is ON since it is
generating high-voltage.
e-STUDIO555/655/755/855
FUSER UNIT
IH cover-1
Screw
IGBT
© 2009 - 2011 TOSHIBA TEC CORPORATION All rights reserved
13 - 16
Fig. 13-11
Screw
Fig. 13-12
Red
Blue
Black
( Without tag )
Fig. 13-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents