Intended Operation - R&S NGL200 Series User Manual

Hide thumbs Also See for NGL200 Series:
Table of Contents

Advertisement

®
R&S
NGL200/NGM200
Exceeding the low voltage protection
Use insulated wires and not bare wires for the terminal connection.
It is assumed that only qualified and trained personnel service the power supplies and
the connected loads.
Before switching on the product, it must be ensured that the nominal voltage setting on
the product matches the nominal voltage of the AC supply network.

4.1.2 Intended Operation

The instrument is intended only for use by personnel familiar with the potential risks of
measuring electrical quantities.
For safety reasons, the instrument may only be connected to properly installed wall
outlets. Separating the ground is prohibited.
The power cable must be inserted before signal circuits may be connected.
Use only the power cable included in the delivery package. See
on page 17.
Before each measurement, measuring cables must be inspected for damage and
replaced if necessary. Damaged or worn components can damage the instrument or
cause injury.
The instrument may be operated only under the operating conditions and in the posi-
tions specified by the manufacturer, without the product's ventilation being obstructed.
If the manufacturer's specifications are not observed, this can result in electric shock,
fire and/or serious personal injury, and in some cases, death.
Applicable local or national safety regulations and rules for the prevention of accidents
must be observed in all work performed.
The instrument is designed for use in the following sectors: Industrial, residential, busi-
ness and commercial areas and small businesses.
The instrument is designed for indoor use only. Before each measurement, you need
to verify at a known source if the instrument functions properly.
To disconnect from the mains, unplug the IEC socket on the back panel.
See
tion, see the instrument datasheet (P/N: 5216.1057.32).
User Manual 1178.8736.02 ─ 05
Table 4-1
for the general data on the instrument specification. For more informa-
Getting Started
Putting into Operation
"Delivery package"
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents