Intended Operation - R&S NGE100B Series User Manual

Hide thumbs Also See for NGE100B Series:
Table of Contents

Advertisement

®
R&S
NGE100B
Risk of electric shock
It is prohibited to disconnect the earthed protective connection inside or outside of the
instrument!
If it is assumed that a safe operation is no longer possible, the instrument must be shut
down and secured against any unintended operation.
Safe operation can no longer be assumed as follows:
Instrument shows visible damage
Instrument includes loose parts
Instrument no longer functions properly
Exceeding the Low Voltage Protection
Use insulated wires and not bare wires for the terminal connection.
For the series connection of all output voltages, it is possible to exceed the low voltage
protection of 42 V. Please note that in this case any contact with live components is
life-threatening. It is assumed that only qualified and trained personnel service the
power supplies and the connected loads.
Prior to switching on the product, it must be ensured that the nominal voltage setting
on the product matches the nominal voltage of the AC supply network. If it is necessary
to set a different voltage, the power fuse of the product must be changed accordingly.

4.1.2 Intended Operation

The instrument is intended only for use by personnel familiar with the potential risks of
measuring electrical quantities.
For safety reasons, the instrument may only be connected to properly installed safety
socket outlets. Separating the ground is prohibited.
The power plug must be inserted before signal circuits may be connected.
User Manual 5601.1343.02 ─ 04
After an extended period of storage under unfavorable conditions (e.g. out-
doors or in damp rooms)
After rough handling during transport (e.g. packaging that does not meet the
minimum requirements by post office, railway or forwarding agency)
Quick Start
Putting into Operation
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nge103bNge102b

Table of Contents