Abbott CELL-DYN 3200 System Operator's Manual page 426

Table of Contents

Advertisement

Service and Maintenance
Nonscheduled Maintenance Procedures
1 Power Supply
2 Fuse Holder
3 Fuse Holder Notch
Figure 9.22 Fuse Replacement
Preparation for Shipping or Extended Period of Non-Use
9-56
5. If it has obviously failed, replace it. Note the amp reading on the fuse and be
sure you replace it with the correct fuse (8-amp or 4-amp).
NOTE: If the power setting is 110/120 VAC, use the 8-amp fuse. If the
power setting is 220/240 VAC, use the 4-amp fuse.
6. If you are not sure if the fuse has failed, replace it and see if the problem is
corrected.
7. To replace a fuse, insert the new fuse (either end) into the holder. Insert the
holder (fuse first) all the way into the fuse slot.
8. Insert a flathead screwdriver into the notch on the fuse holder, push in, and
turn clockwise to tighten the fuse holder.
9. Reconnect the power cord and turn the system ON.
10. Record the maintenance in your maintenance log.
The Prepare For Shipping cycle must be run if the instrument will not be used for
two weeks or more. This cycle must also be run if:
a. The instrument will be shipped
b. The instrument will be moved (for example, to a different location within
a laboratory) and movement will require detaching the reagent inlet
tubing.
1
2
3
CELL-DYN
3200 System Operator's Manual
®
9140181K—July 2002
Section 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents