Attach The Gtz Quad Connector; Gtz Transceiver Clock Connection - Xilinx Virtex-7 FPGA VC7222 IBERT Getting Started Manual

Vivado design suite 2014.2. characterization kit ibert
Hide thumbs Also See for Virtex-7 FPGA VC7222 IBERT:
Table of Contents

Advertisement

Attach the GTZ Quad Connector

Before connecting the BullsEye cable assembly to the board, firmly secure the blue
elastomer seal provided with the cable assembly to the bottom of the connector housing if
it is not already inserted (see
Attach the Samtec BullsEye connector to GTZ Quads Q300A and Q300B
aligning the two indexing pins on the bottom of the connector with the guide holes on the
board. Hold the connector flush with the board and fasten it by tightening the two captive
screws.
X-Ref Target - Figure 1-22

GTZ Transceiver Clock Connection

Connect the GTZ reference clocks, CLK0 and CLK1, to the SuperClock-2 module as follows
(see
J56 (REFCLK0_P) → SMA connector → J7 (CLKOUT2_P) on the SuperClock-2 module
J57 (REFCLK0_N) → SMA connector → J8 (CLKOUT2_N) on the SuperClock-2 module
J46 (REFCLK1_P) → SMA connector → J5 (CLKOUT1_P) on the SuperClock-2 module
J47 (REFCLK1_N) → SMA connector → J6 (CLKOUT1_N) on the SuperClock-2 module
VC7222 IBERT Getting Started Guide
UG971 (v5.0) June 12, 2014
Figure
Figure 1-22: BullsEye Connector Attached to GTZ Quads Q300A and Q300B
Figure
1-23):
www.xilinx.com
Running the GTZ IBERT Demonstration
1-4).
(Figure
1-22),
27