Toro Outcross 9060 Service Manual page 332

Table of Contents

Advertisement

Removing the Operator's Platform (continued)
Chassis: Service and Repairs
g255201
1.
Compressor
2.
Refrigerant hose (pressure)
16. For machines equipped with air conditioning, discharge the refrigerant
hoses in accordance with local regulations and disconnect the hoses at the
compressor. Cap the fittings and plug the hoses to prevent contamination
from entering the air conditioning system.
17. Remove the rubber boot from the auxiliary load valve.
18. For machines equipped with a front loader, remove the knob, jam nut and
rubber boot from the loader valve.
19. Remove the 4 flange nuts, snubbing washers and cap screws securing the
operator platform to the frame.
The standard operator platform assembly weighs approximately
748 kg (1,650 lb). The operator platform and cab assembly weighs
approximately 952 kg (2,100 lb). Use an appropriate hoist to raise
and lower the operator platform assembly.
20. Using the 4 lift points provided, raise the operator platform a few inches.
Place blocks between the operator platform mounts and the chassis, then
ensure all the required hoses and wire harnesses are disconnected and
free to separate from the chassis.
Figure 140
3.
Refrigerant hose (return)
CAUTION
Page 8–12
Outcross 9060
18234SL Rev B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

07511ba07511ca07511aa07511da

Table of Contents