Toro Outcross 9060 Service Manual page 187

Table of Contents

Advertisement

Installing the Steering Control Valve
Outcross 9060
18234SL Rev B
1. Lubricate new O-rings and place them onto the fittings. If previously
removed, install the fittings into the valve ports using alignment marks made
during removal; refer to
O-Ring Fittings) (page
2. Apply anti-seize to the splines of the steering control valve and the bottom
splines of the steering column. Install the alignment ring, then hold the
steering control valve and steering column to the plate and install the four
flange head screws. Tighten the screws from 46 to 57 N·m (34 to 42 ft-lb).
g242888
1.
Pressure (in) port – P
2.
Tank (out) port – T
3.
Left turn port – L
3. Connect the hydraulic hoses and lines to the steering control valve.
4. Install the dash cover and steering wheel; refer to
Wheel, Instrument Panels and Dash Cover (page
Installing the Hydraulic Fittings (SAE Straight Thread
5–10).
Figure 54
4.
Right turn port – R
5.
Load sensing port – LS
Page 5–91
Installing the Steering
8–16).
Hydraulic System: Service and Repairs

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

07511ba07511ca07511aa07511da

Table of Contents