5
Using the Agilent 7100 Capillary Electrophoresis System
Capillary Electrochromatography, CEC
Preparing the Agilent CE Instrument for High Pressure Use
1 Ensure that the gas source is switched off prior to connection.
2 Connect the push-fit connector and gas line to the receptor on the rear of
3 Connect the gas line to the source.
4 Switch on the gas supply.
5 Select under Instrument in the CE diagram the Instrument Configuration Menu,
Figure 44
150
the Agilent CE instrument.
see
Figure
44.
Configuration menu
Agilent 7100 Capillary Electrophoresis System User Manual