Operating guide | VACON® NXS/NXP Air-cooled
A
FR9
A Control terminals
C Grounding terminals
Illustration 20:
FR9 Terminals
6.5 Installing the Cables
Context:
Use these instructions to find the installation instructions of the correct enclosure size.
Procedure
1. Check the requirements related to lengths, distances, and positioning of the cables according to instructions in
Instructions for Cable
Installation.
2. Follow the installation instructions of the correct enclosure size. To check the enclosure size of the AC drive, see
•
6.5.2 Installing the Cables, FR4-FR6
•
6.5.3 Installing the Cables, FR7
•
6.5.4 Installing the Cables, FR8
•
6.5.5 Installing the Cables, FR9
•
6.5.6 Installing the Cables, FR10-FR11
56 | Danfoss A/S © 2018.06
B
C
B Motor terminals
Electrical Installation
6.5.1 Additional
3.5 Enclosure
Sizes.
DPD00910G