Mechanically Joining The Sections; Figure 4-4. Removing The Upm Section Right Side Shipping Bracket - Eaton Powerware 9395 UPS 10001100 kVA Installation And Operation Manual

1000–1100 kva
Table of Contents

Advertisement

Pallet
4.3

Mechanically Joining the Sections

EATON Powerware
Right Side Shipping
Bracket

Figure 4-4. Removing the UPM Section Right Side Shipping Bracket

NOTE The following procedure permits the UPS sections to be installed in a location where there is limited
space to slide the sections together from the sides.
NOTE For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the
section (see Table 3-1 on page 3−2 for cabinet weight).
1.
Using a forklift, move the UPM section to the final installed location.
2.
Remove one top screw and two bottom screws securing the UPM section
wireway panel (see Figure 4-5). Lift the panel straight up to remove it from the
panel hanger brackets at the top of the cabinet.
3.
Remove the screws securing the top and bottom internal safety shield panels
and remove the panels. Retain the hardware for later use.
4.
Remove the screws securing the corner channel and remove the channel (see
Figure 4-5). Retain the hardware for later use.
®
9395 UPS (1000–1100 kVA) Installation and Operation Manual
UPS SYSTEM INSTALLATION
S
164201764 Rev 1 www.powerware.com
Shipping Bracket
Bolts
Shipping Bracket
Bolts
4−5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9395

Table of Contents