Page 6
93PM Unit and Fastener Requirements from Unit to Floor..............28 Table 11. 93PM Unit Seismic Displacement Requirements ................. 29 Table 12. 93PM Unit Center of Gravity Specifications ..................30 Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Page 7
C C h h a a p p t t e e r r 1 1 I I n n t t r r o o d d u u c c t t i i o o n n t t o o S S e e i i s s m m i i c c M M o o u u n n t t i i n n g g P P l l a a n n s s a a n n d d R R e e q q u u i i r r e e m m e e n n t t s s Eaton equipment represented in the following sections were subjected to seismic testing in accordance with the 2006 or 2012 International Building Code (IBC) and the 2007 California Building Code (CBC).
The user is responsible for compliance with all local seismic codes. N N O O T T E E Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition.
P P o o w w e e r r C C a a b b l l e e s s It is recommended that power cables be lashed together at least every meter within the equipment. Refer to the appropriate Eaton UPS instruction and operation manual for other requirements related to securing power cables.
Eaton 9x55 UPS Foundation Plan and Mounting Requirements Figure 1. 9x55 Stackable Unit Seismic Mounting Detail Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9x55 UPS Foundation Plan and Mounting Requirements Figure 2. 9x55 20-30 kVA Cabinet Seismic Mounting Detail Installing the Hold Down Brackets Installing the Seismic Gusset Front Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
The user is responsible for compliance with all local seismic codes. N N O O T T E E Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition.
P P o o w w e e r r C C a a b b l l e e s s It is recommended that power cables be lashed together at least every meter within the equipment. Refer to the appropriate Eaton UPS instruction and operation manual for other requirements related to securing power cables.
Eaton 9390 Foundation Plan and Mounting Requirements Figure 3. 9390 80 kVA UPS Seismic Mounting Detail Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9390 Foundation Plan and Mounting Requirements Figure 4. 9390 160 kVA UPS Seismic Mounting Detail Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9390 Foundation Plan and Mounting Requirements Figure 5. 9390 20-80 kVA IDC Seismic Mounting Detail Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9390 Foundation Plan and Mounting Requirements Figure 6. 9390 20-80 kVA with Sidecar Seismic Mounting Dimensions Figure 7. 9390 100-160 kVA with Sidecar Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9390 Foundation Plan and Mounting Requirements Figure 8. 9390 160 kVA IDC Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9390 Foundation Plan and Mounting Requirements Figure 9. 9390 80 kVA and 160 kVA IAC (B, D, & T) Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
The user is responsible for compliance with all local seismic codes. N N O O T T E E Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition.
Page 21
Class 8.8, M12 64 lb-ft. 1500 kW (LD) UPS NOTE The torque value for each bracket-to-cabinet connecting bolt is Class 8.8 M12 Bolt = 83 Nm [61 lb-ft.] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Attachments must have provisions to accommodate the displacement of the equipment indicated in Table Entry from the bottom of the equipment eliminates the need for accommodating this motion for attachments. Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
1200 kVA UPS (4X-UPM) 2444 mm 365 mm 915 mm 1500 kW (HD) UPS 1553 mm 383 mm 780 mm 9395XC 1500 kW (LD) UPS 1721 mm 384 mm 784 mm Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
P P o o w w e e r r C C a a b b l l e e s s It is recommended that power cables be lashed together at least every meter within the equipment. Refer to the appropriate Eaton UPS instruction and operation manual for other requirements related to securing power cables.
Figure 12. 9395 550 kVA or 9395P 600 kVA UPS Seismic Mounting Dimensions Figure 13. 9395 550 kVA or 9395P 600 kVA UPS and FI-UPM Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9395, 9395P and 9395XC Foundation Plan and Mounting Requirements Figure 17. 9395 1100 kVA UPS or 825 kVA +1 or 9395P 1200 kVA UPS Seismic Mounting Dimensions Figure 18. 9395 MBM Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9395, 9395P and 9395XC Foundation Plan and Mounting Requirements Figure 19. 9395 MBM and 275 kVA UPS Seismic Mounting Dimensions Figure 20. 9395 MBM and 550 kVA UPS Seismic Mounting Dimensions Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9395, 9395P and 9395XC Foundation Plan and Mounting Requirements Figure 23. 9395 Seismic Door Securing Hardware Detail Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9395, 9395P and 9395XC Foundation Plan and Mounting Requirements Figure 24. 9395 I/O Intercabinet Shim Location and Seismic Floor Bracket Attachment Detail I/O Cabinet Right Side Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9395, 9395P and 9395XC Foundation Plan and Mounting Requirements Figure 25. 9395 FI-UPM Shim Location Detail for Seismic Kit Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 9395, 9395P and 9395XC Foundation Plan and Mounting Requirements Figure 26. 9395 Attachment Detail for FI-UPM and I/O Module Front Front FI-UPM Right Side I/O Cabinet Right Side Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
The user is responsible for compliance with all local seismic codes. N N O O T T E E Anchoring hardware is not provided with Eaton seismic mounting kits because the type of hardware is dependant on the foundation construction and composition.
140 mm 93PM-L UPS 60 kW with 208 Vac MBS Left or Right-Mounted Sidecar or 120 mm 140 mm UPS 120 kW with Top Entry/MBS Left or Right-Mounted Sidecar Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
922 mm Sidecar UPS 150 kW Frame 530 mm 282 mm 1014 mm UPS 150 kW Frame with Top Entry Left-Mounted 534 mm 434 mm 979 mm Sidecar Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Page 37
600 mm 1046 mm IBC-L, IBC-LH (432V) with Left-Mounted Sidecar 612 mm 600 mm 1046 mm IBC-L, IBC-LH (432V) with Right-Mounted Sidecar 444 mm 600 mm 1046 mm Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Page 38
P P o o w w e e r r C C a a b b l l e e s s It is recommended that power cables be lashed together at least every meter within the equipment. Refer to the appropriate Eaton UPS instruction and operation manual for other requirements related to securing power cables.
NOTE: 93PM-L 60 kW UPS with Top Entry Sidecar and 93PM UPS 50, 100, and 150 kW UPS with Small Sidecar floor mounting brackets and locations are identical. Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
93PM-L with Left-Mounted Large Sidecar 93PM-L with Right-Mounted Large Sidecar NOTE: 93PM-L 60 kW and 120 kW UPS floor mounting brackets and locations are identical. Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
UPS with Left-Mounted Sidecar UPS with Right-Mounted Sidecar NOTE: 93PM 100 kW and 150 kW UPS floor mounting brackets and locations are identical. Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Figure 31. 93PM-L UPS 160 kW (208V) Seismic Mounting Dimensions 12X M12 OR (12X 1/2” BOLT) (6EA FRONT & REAR) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Figure 32. 93PM-L UPS 200 kW (208V) Seismic Mounting Dimensions 8X M12 OR (8X 1/2” BOLT) (4EA FRONT & REAR) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Figure 33. 93PM UPS (200 kW Frame) Seismic Mounting Dimensions (480V) (8X) M12 OR (8X) 1/2” BOLT ( FRONT & BACK) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
(12X) M12 OR (12X) 1/2” BOLT (12X) 1/2” BOLT ( FRONT & BACK) ( FRONT & BACK) UPS with Left-Mounted Sidecar UPS with Right-Mounted Sidecar Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Figure 36. 93PM-L (208V) and 93PM (480V) IAC-D Seismic Mounting Dimensions (8X) M12 OR (8X) 1/2” BOLT ( FRONT & BACK) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Figure 37. 93PM (480V) IAC-T Seismic Mounting Dimensions (8X) M12 OR (8X) 1/2” BOLT ( FRONT & BACK) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
(8X) M12 OR (8X) 1/2” BOLT ( FRONT & BACK) NOTE: 93PM-L IAC-B and 93PM IAC-BD floor mounting brackets and locations are identical. Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Figure 39. 93PM-L (208V) and 93PM (480V) IAC-PD Seismic Mounting Dimensions (8X) M12 OR (8X) 1/2” BOLT ( FRONT & BACK) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Figure 40. 93PM IBC-S Seismic Mounting Dimensions (8X) M12 OR (8X) 1/2” BOLT ( FRONT & BACK) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Figure 41. 93PM IBC-L and IBC-LH Seismic Mounting Dimensions (8X) M12 OR (8X) 1/2” BOLT ( FRONT & BACK) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Figure 42. 93PM IBC-L and IBC-LH with Sidecar Seismic Mounting Dimensions (12X) M12 OR (12X) M12 OR (12X) 1/2” BOLT (12X) 1/2” BOLT ( FRONT & BACK) ( FRONT & BACK) Dimensions are in millimeters [inches] Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Page 56
Once the brackets are properly aligned, secure the brackets by tightening the screws to the following torque specifications. Door bracket M4 screws 2.0–3.3 Nm, or 18–29 in-lbs. Cabinet bracket M5 screws 4.1–6.6 Nm, or 36–58 in-lbs. Close and secure the UPS door. Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
NOTE Slots in cabinet bracket allow for adjustment in the depth direction. N N O O T T E E 1 1 The Seismic Door Retention kit is designed for use with all Eaton 93PM UPS (480V) and Eaton 93PM-L UPS (208V) models.
Install the door bracket and secure with screws previously removed. NOTE The interior of the UPS door is identical for the Eaton 93PM-L UPS (208V) and Eaton 93PM UPS (480V) models. Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
NOTE For clarity, the UPS door is not shown. Holes used to mount the cabinet bracket. Eaton 93PM (480V) UPS NOTE For clarity, the UPS door is not shown. Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
NOTE For clarity, the UPS door is not shown. Cabinet bracket installed (bolts provided in kit). Eaton 93PM (480V) UPS NOTE For clarity, the UPS door is not shown. Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Page 61
Eaton 93PM (480V) and 93PM-L (208V) Foundation Plan and Mounting Requirements Seismic Data Requirements for Eaton UPS Equipment Installation User’s Guide 164000050—Rev 05...
Need help?
Do you have a question about the 9 55 Series and is the answer not in the manual?
Questions and answers