Eaton Powerware 9395 UPS 10001100 kVA Installation And Operation Manual page 83

1000–1100 kva
Table of Contents

Advertisement

UPS SYSTEM INSTALLATION
Distributed Bypass Installation Checklist
- Each cabinet in the distributed bypass system is placed in its installed location.
- All conduits and cables are properly routed to the UPS cabinets and to the tie cabinet or distribution panel.
- All power cables are properly sized and terminated.
- Neutral conductors are installed or bonded to ground as per requirements.
- A ground conductor is properly installed.
- Controller Area Network (CAN) wiring between the UPS cabinets is properly installed.
- Pull−chain wiring between the UPS cabinets is properly installed.
- Adequate workspace exists around the UPS cabinets, the tie cabinet, and other cabinets.
- Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.
EATON Powerware
S
164201764 Rev 1 www.powerware.com
4−39
®
9395 UPS (1000–1100 kVA) Installation and Operation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9395

Table of Contents