Figure 5-9. J1, J2, J3, And J4 15−Pin D−Sub Connectors - Eaton Powerware 9395 UPS 10001100 kVA Installation And Operation Manual

1000–1100 kva
Table of Contents

Advertisement

INSTALLING OPTIONS AND ACCESSORIES
5−12
EATON Powerware
10. Restart the UPS. See Chapter 7, UPS Operating Instructions," for startup
instructions.
NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
11. Contact an Eaton service representative for verification and testing of the RIM II
and its connections prior to making connections with J1 through J4 (see
Table 5-6 and Figure 5-9).
You can order interface cables separately for connecting to the 15-Pin D-Sub
Connectors.
Table 5-6. J1 through J4 Interface Connectors
Status
UPS AVAILABLE
UPS OFFLINE
BATTERY WEAK
UTILITY FAILURE
®
9395 UPS (1000–1100 kVA) Installation and Operation Manual
J1 through J4
Description
Pins 1 and 12
Contacts are closed when the UPS is operating in Normal mode
or ready to supply the load.
Pins 3 and 13
Contacts are open when the UPS is offline. Contacts are closed
when the UPS is operating in Normal mode.
Pins 5 and 14
Contacts are closed when approximately two minutes of battery
time remains before the critical load is lost.
Pins 6 and 15
Contacts are closed when Utility Failure is detected.
15−Pin D-Sub
Connectors
Figure 5-9. J1, J2, J3, and J4 15−Pin D−Sub Connectors
S
164201764 Rev 1 www.powerware.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9395

Table of Contents