Figure 5-11. Supervisory Contact Module Ii Tb2 - Eaton Powerware 9395 UPS 10001100 kVA Installation And Operation Manual

1000–1100 kva
Table of Contents

Advertisement

INSTALLING OPTIONS AND ACCESSORIES
5−14
EATON Powerware
NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
9.
Install wiring between the SCM II terminal block TB2 and the monitoring
equipment. See Figure 5-10 for terminal block location and Figure 5-11 for
terminal assignments.
10. Close the front door and secure the latch.
11. Restart the UPS. See Chapter 7, UPS Operating Instructions," for startup
instructions.
NOTE Supervisory contacts are rated at 2.0A at 28 Vdc or 120 Vac and 0.15A at 115 Vdc.
NOTE Supervisory contacts require an external power supply. Internal 24 Vdc is not capable of supplying
contact current.
®
9395 UPS (1000–1100 kVA) Installation and Operation Manual
System Normal
No Redundancy
On Generator
Bypass Not Available
On Battery
UPS Alarm
On Bypass
Shutdown Imminent

Figure 5-11. Supervisory Contact Module II TB2

S
164201764 Rev 1 www.powerware.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9395

Table of Contents