UPS SYSTEM INSTALLATION
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
BOTTOM VIEW
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
4−18
EATON Powerware
®
9395 UPS (1000–1100 kVA) Installation and Operation Manual
Figure 4-16. ISBM Section Conduit and Wire Entry Locations
S
164201764 Rev 1 www.powerware.com
Front
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X−Slot Connections
(Remove panels to drill or punch conduit holes.)
Front