9TGOF2·058
TURBOCHARGER
F2
10. Connect the joint hose with the alignment mark matched,
and tighten the hose clamp.
Tightening torque:
3.9-4.9 N·m (40-50
em-kg,
35-43
in-Ib)
11. Install the oil pipe and a new washer.
Tightening torque:
15.7-23.5 N·m (1.6-2.4
m-kg,
12-17
ft-Ib)
9TGOF2'()S9
I
12. Install the water pipe and a new washer.
Tightening torque:
15.7-23.5 N·m (1.6-2.4
m-kg,
12-17
ft-Ib)
13. Install the exhaust manifold heat insulator.
Tightening torque:
7.8-10.8 N-m (0.8-1.1 m-kg, 5.8--8.0
ft-Ib)
14. Install the turbocharger heat insulator.
Tightening torque:
7.8-10.8 N-m (0.8-1.1
m-kg,
5.8-8.0
ft-Ib)
F2-25