Removing And Installing Gearshift Lever And Linkage; Removing And Installing Gearshift Lever - BMW K 1200 LT 1999 Repair Manual

Table of Contents

Advertisement

10
9
Removing and installing gearshift
lever and linkage
Slacken screws securing front footrest plate.
Remove retainer pin (2).
Disengage gearshift linkage at ball joint (1).
Remove front footrest plate.
Remove bearing screw (8).
Remove retaining pin (5).
Disengage gearshift linkage at ball joint (6).
Remove relay lever (3).
Remove selector lever (7).
Installation is the reverse of the removal proce-
dure: pay particular attention to the following.
L
Note:
Note mark (arrow) on gearshift lever.
Lubricate bearing bushing (4) with
Staburags NBU 30 PTM or equivalent.
L
Note:
Ball joint (1) on gearshift lever is secured with lock-
ing compound. After removal of ball joint (1) clean
threads and install with small washer and
Loctite 2701.
X
Tightening torques:
Relay lever to cross tube ................................ 9 Nm
Pinch bolt of gearshift lever (7) ....................... 9 Nm
Ball head (1) to gearshift lever
(clean thread + Loctite 2701........................... 8 Nm
23.40
2
1
3
8
Removing and installing gearshift
lever
X
Gearshift lever to footrest plate
(clean thread and Loctite 243)...................... 41 Nm
4
Remove screw (10).
Remove gearshift lever with bearing bushing (9).
Installation is the reverse of the removal proce-
dure: pay particular attention to the following.
Lubricate bearing bushing (9) with
Staburags NBU 30 PTM or equivalent.
Clean threads of screw (10), coat with
Loctite 243 and install.
Tightening torques:
5
6
7
KL230030

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents