BMW K 1200 LT 1999 Repair Manual page 147

Table of Contents

Advertisement

Removing and installing throttle
cables
Preparatory work for all Bowden
cables
Remove left and right fairing side sections.
....................................................See Group 46
a
Remove tank cover.
d
Warning:
Comply with safety precautions when handling or
working with fuel.
Remove fuel tank.
....................................................See Group 16
a
Remove left air outlet duct.
1
Disconnect plugs (1) of injection valves.
Remove fuel injection rail.
[Activated charcoal filter] Remove timing valve
from its holder.
Remove intake air silencer.
13.12
Removing and installing throttle-
opener and throttle-closer cables
Remove left and right handlebar trim sections.
....................................................See Group 46
a
Remove cover of fork bridge.
2
3
8
Remove screw (5) and remove cover (4).
Disengage adjusting screw (7) for throttle-closer
cable (3).
Open adjusting screw (8) for throttle-opener
cable (2).
Remove throttle-cable relay (6).
Disengage throttle-opener cable (2) from its pull
and remove.
Disengage throttle-closer cable (3) from its pull.
[Chrome grips] Turn throttle twist grip clockwise
as far as it will go and disengage throttle-closer
KL130040
cable (3).
Release cable ties at fairing bracket and pull
throttle cables down toward fuel injection rail to
remove.
Disengage throttle-opener cable (2) from its pull
at throttle-valve rail.
7
6
2
4
5
KL320042
KL130050

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents