GE MiCOM P40 Agile Technical Manual page 369

Hide thumbs Also See for MiCOM P40 Agile:
Table of Contents

Advertisement

Programmable Logic
MiCOM 40 Agile P442, P444
Ordinal
English Text
0 to 63
Relay Label 01 to
Relay Label 64
1081
Reset All values
1082
Reset Latches
1080
Reset Lockout
1091
Reset Thermal
270
Reversal Guard
1112
RP1 Read Only
1113
RP2 Read Only
351
S. Swing
353
S. Swing Conf
437
SBO Closed Org 1
438
SBO Closed Org 2
439
SBO Closed Org 3
440
SBO Closed Org 4
1118
SBO Command1
1122
SBO Command2
1126
SBO Command3
1130
SBO Command4
1116
SBO DPI1 Org1
1120
SBO DPI1 Org2
1124
SBO DPI1 Org3
1128
SBO DPI1 Org4
1117
SBO DPI2 Org1
1121
SBO DPI2 Org2
Description
OUTPUT RELAY 1 to
OUTPUT RELAY 64
High level when a DDB cell (linked by PSL logic) is at
1. State depends on the logic set in the PSL (MiCOM
S1 Agile)
These programmable relays are assigned in the default
PSL, with the following logic conditions (see section
1.8.2):
- Pulse time-delay
- Pick Up/Drop Off Time-delay
- Dwell Time-delay
- Pick Up Time-delay
- Drop Off Time-delay
- Latching
- Straight (used in default PSL)
Reset all values of CB monitoring (all counters and
values are reset ('CB condition')
Reset all permanent alarms + LEDs and relays are
latched
Reset all CB monitoring lockout (all counters and
values are reset ('CB condition')
Reset Thermal Overload Protection
Current reversal guard logic in action
(Directional switching from Rev to Fwd in parallel line
application)
All setting changes and most command/control actions
blocked for Rear Port 1.
All setting changes and most command/control actions
blocked for Rear Port 2.
Start of Stable Swing (1st cycle): The first stable swing
cycle has been detected (Zlocus in/out with the same
R sign) & the « Stable Swing start » picks-up
Stable Swing confirmed (number of cycles reached)
Select Before Operate (SBO) closing function for
organ 1 (interlocking facility in the IEC 60870-5-103
protocol)
Select Before Operate (SBO) closing function for organ
2 (interlocking facility in the IEC 60870-5-103 protocol)
Select Before Operate (SBO) closing function for organ
3 (interlocking facility in the IEC 60870-5-103 protocol)
Select Before Operate (SBO) closing function for organ
4 (interlocking facility in the IEC 60870-5-103 protocol)
SBO support for IEC 61850-8-1 function command 1
SBO support for IEC 61850-8-1 function command 2.
SBO support for IEC 61850-8-1 function command 3
SBO support for IEC 61850-8-1 function command 4.
SBO support for IEC 61850-8-1 function. SBO Double
Point Information 1 Organe 1
SBO support for IEC 61850-8-1 function. SBO Double
Point Information 1 Organe 2
SBO support for IEC 61850-8-1 function. SBO Double
Point Information 1 Organe 3
SBO support for IEC 61850-8-1 function. SBO Double
Point Information 1 Organe 4
SBO support for IEC 61850-8-1 function SBO Double
Point Information 2 Organe 1
SBO support for IEC 61850-8-1 function SBO Double
Point Information 2 Organe 2
P44x/EN PL/Hb6
(PL) 6-49
Source
RELAY
PSL (IN) CB
Monitoring
PSl (IN)
PSL (IN) CB
Monitoring
PSL(IN)
PSL (OUT)
Distance
PSL
PSL
PSL (OUT)
PSL (OUT)
PSL
PSL
PSL
PSL
PSL
PSL
PSL
PSL
PSL
PSL
PSL
PSL
PSL
PSL

Advertisement

Table of Contents
loading

This manual is also suitable for:

P442P444

Table of Contents