Siemens LMS14 User Manual page 168

Albatros2 boiler management unit
Table of Contents

Advertisement

Key
168/617
Building Technologies Division
55
50
45
40
35
30
25
20
0
1
5
7
Fh
1
Figure 28: Floor curing function
Line no.
HC1
HC2
HC3
8744
8774
8803
The temperature change always takes place at midnight. The start day (day 0), that is,
the period of time from activation of the function to midnight, does not count as a
functional day. The setpoint used for the start day is the value of the first functional day.
During Floor curing, the profile temperature (TVEp) is limited within the 2 values Flow
temp setpoint max (TVmax) and Flow temp setpoint min (TVmin).
The function is ended when the functional days have elapsed or when deactivated via
parameterization.
User Manual LMS14...
6 The settings in detail
1
5
10
Bh
Fh + Bh
Meaning
TVw
Flow temperature setpoint 1/2/3
Bh
Curing heating
Fh
Functional heating
X
Start day
15
18
[Day
25
CC1U7471en
07.05.2014
]

Advertisement

Table of Contents
loading

Table of Contents